Production line testing and commissioning.

Testing and commissioning of our own installations, inside the agreed window.

A multimeter and test leads on a terminal rail during commissioning

What commissioning covers here

Point-to-point checks, loop checks, energisation, dry runs, and then running the line under load until it stays up. Under load means real material. An empty conveyor behaves differently from a full one.

The shutdown is the window

The commissioning window is agreed before installation starts, because the back end of a project is where time gets borrowed quietly whenever something else overruns. If installation slips, you hear what it does to commissioning in the week we find out.

Handover

The line is commissioned on time. That is the date that does not move. Test records and as-built documentation follow by the end of the project at the latest, and you know where they stand throughout. The operator briefing is given by whoever wired the line.

HOW A PROJECT RUNS

  1. 01

    SURVEY

    We walk the plant and look at what is there and what is missing. Old drawings rarely match reality, so we measure for ourselves. You hear the findings before anything is promised.

  2. 02

    SCHEDULE

    The date and the commissioning window are agreed before work starts. Usually they hang off the shutdown, when the hall is full of other contractors and every hoist is booked. Resourcing is best locked down well in advance.

  3. 03

    INSTALL

    Drawn before it is pulled, labelled before it is live. The site is cleared daily. In most plants that is a fire safety matter as much as a tidiness one.

  4. 04

    COMMISSION

    Loop checks, dry runs and running under load. The handover briefing is given by whoever wired it. Test records follow by the end of the project at the latest.

The questions that usually come first.

Do you sign off commissioning inspections on other firms’ work?

No. We commission and inspect the installations we delivered ourselves. We do not take inspection liability for another contractor’s work. That is a line we hold.

What happens if installation runs late?

You hear the effect on commissioning in the week we find out. The commissioning window does not move quietly, because that is the part of a project everyone borrows time from.

Is the line run under load before handover?

Yes, with real material, because an empty conveyor behaves differently from a full one. The line runs until it stays up.

Who briefs the operators?

Whoever wired the line. The briefing happens at the line itself.